Login for trade account prices

Wheel series 100x40mm Extrathane polyurethane on cast iron centre bore 20mm H7 hub length 40mm plain bearing with keyway 6x2.8mm 350kg
Wheel series 100x40mm Extrathane polyurethane on cast iron centre bore 20mm H7 hub length 40mm plain bearing with keyway 6x2.8mm 350kg
99.88 €
99.88 €
19mm THREAD FIXING BALL TRANSFER UNIT, ZINC.
19mm THREAD FIXING BALL TRANSFER UNIT, ZINC.
7.46 €
7.46 €

22mm 'DROP-IN' BALL TRANSFER UNIT, ZINC.

https://www.parnells.eu/web/image/product.template/34504/image_1920?unique=ecce3d9
(0 review)

7.48 € 7.48 EUR 7.48 €

8.69 €

Login for trade prices

Not Available For Sale


  • Type
  • Material
  • Dimension 'A' (mm)
  • Dimension 'B' (mm)
  • Dimension 'C' (mm)
  • Dimension 'D' (mm)
  • Colour
  • Material / Finish

This combination does not exist.


Share :
Sensible Prices
Fast Delivery
Unlimited Returns
Huge Stock
22mm 'DROP-IN' BALL TRANSFER UNIT, ZINC.

Light duty pressed steel ball transfer unit manufactured with standard zinc plated finish. All ball contact surfaces are case hardened to ensure a long trouble free service. Spring Clip BTA22SC suitable for use with BTA22 BTA units are fitted with a felt seal.

Add to cart

Sign in

Pay

Get Delivered

Part Number BTA22
Type Ball Transfer Unit
Material Zinc
Dimension 'A' (mm) 45
Dimension 'B' (mm) 27.5
Dimension 'C' (mm) 8.2
Dimension 'D' (mm) 36.0
Colour Zinc plated steel
Material / Finish Zinc plated steel
Info Block Image 01

 Shipping & Delivery


We ship products every day throughout Europe from our head office & warehouse in Dublin Ireland.

All parcels are shipped with courier with tracked parcel shipping service.

See below table which show shipping times and approx. price for parcel delivery throughout Europe.

Info Block Image 02
Country Average Delivery Time Approx Delivery Cost
Austria 4-5 Days €17.00 (per parcel)
Belgium 3-4 Days €16.00 (per parcel)
Bulgaria 6-7 Days €35.00 (per parcel)
Croatia 5-7 Days €35.00 (per parcel)
Czech Republic 4-5 Days €19.00 (per parcel)
Denmark 4-5 Days €17.00 (per parcel)
Estonia 5-6 Days €25.00 (per parcel)
Finland 5-6 Days €30.00 (per parcel)
France 3-4 Days €16.00 (per parcel)
Germany 3-4 Days €16.00 (per parcel)
Hungary 5-6 Days €21.00 (per parcel)
Ireland 1-2 Days €8.00 (per parcel)
Italy 4-5 Days €25.00 (per parcel)
Latvia 5-7 Days €25.00 (per parcel)
Lithuania 4-5 Days €22.00 (per parcel)
Luxembourg 3-4 Days €16.00 (per parcel)
Netherlands 3-4 Days €16.00 (per parcel)
Northern Ireland 1-2 Days €8.00 (per parcel)
Poland 5-6 Days €19.00 (per parcel)
Portugal 4-5 Days €30.00 (per parcel)
Romania 5-6 Days €35.00 (per parcel)
Slovakia 5-6 Days €21.00 (per parcel)
Slovenia 5-6 Days €21.00 (per parcel)
Spain 4-5 Days €25.00 (per parcel)
Sweden 5-6 Days €21.00 (per parcel)
United Kingdom 2-4 Days* €14.00 (per parcel)
*Shipped DDP, Seller responsible for all Tax or Duty on delivery
Parnells BTA 20 Ball Transfer Unit Spec Sheet-3-1 copy.pdf
Download
BTA 15&22 Ball tranfer unit -data.png
Download
BTA 15&22 Ball transfer unit.jpg
Download
Accessory Products